109 Annual Soil and Groundwater Pollution Investigation and Verification Work Plan-Keelung City
Absrtact |
Funding for this project comes from a subsidy of 6.45 million yuan from the Environmental Protection Agency of the Executive Yuan, and a self-funding subsidy of 1.55 million yuan, totaling NT$ 8 million, from the signing date (December 30, 108) to November 15, 109. The overall plan implementation progress reached 97.8%, which was in line with the contract schedule. The progress results of the completed work projects are summarized as follows:
Liudu Riverside Sports Park 101 (C00033) Trichloroethylene was sampled last year, and the test results of trichloroethylene were all lower than the monitoring standard. In the second half of the year, diffusion bag sampling was carried out for Liudu Riverside Park 101, and the sampling result was lower than the monitoring result. According to standards, the inspection and maintenance operations of 29 monitoring wells in the first half of the year were completed, and the results of internal functional inspections were not abnormal. Taifei Keelung Plant (downstream well), Liudu Wastewater Treatment Plant, Liudu Science and Technology Park Management Center, Arakawa Chemical Co., Ltd. and The basic structure of the monitoring wells of Zhonghua Elementary School is in good condition. The walls of the well pipes and screens are scaled, the bottom of the well is slightly siltated, and the overall return water condition is moderate.
There are 5 pipeline sites within its jurisdiction (Quanyi Gas Station, Beining Road Gas Station, Second Plant of China Electronics Co., Ltd. Liudu General Factory, and Shimen Fuel Supply Service Center, Keelung Business Office, Petroleum Marketing Division, Taiwan Petroleum Co., Ltd. (Badu Reservoir Area) and the Keelung Oil Supply Service Center, Keelung Sales Office of PetroChina Co., Ltd., have conducted 21 inspections each, and there was no abnormal situation during the inspections; Quanyi Gas Station September 109 The third change was proposed on the 18th, and the Environmental Protection Bureau rejected it on September 21. The improvement period has not been completed and the inspection data has not been completed. The test data is currently pending; the Beining Road Gas Station proposed a control plan change, which was reviewed and approved by the Land Mobile Conference , The improvement period is until April 22, 111; the second plant of China Electronics Co., Ltd. Liudu General Factory completed soil excavation and departure, with a total earthwork of about 294 metric tons. The pilot test well was set up and started at the end of August Test related parameters; Shimen Fuel Supply Service Center (Badu Reservoir Area) reached the deadline for improvement on July 29, 109. It submitted an extension application after stating its opinions and promised to complete the improvement work within half a year, so the extension was agreed. The improvement period is until January 27, 110; the Keelung Fuel Supply Service Center has passed an extension application in 109, and the improvement period is until February 7, 109.
A briefing session on the new management business was completed. The underground storage tank of the Heping Island Water Resources Recovery Center had completed the pipeline blockage operation on November 4, 108, and was released from the fire station, so it was not included in the new management business; 3 stations underground storage tank leak detection function and oil and gas detection analysis and 2-point GC map analysis, the detection results are less than 50mV, so there is no related pollution.
5 applications for closure of business transferred by letter from the production and distribution office were reviewed. After checking all the submitted lists, 2 of them belonged to Articles 8 and 9 of the Soil Pollution Law. Yongsheng Environmental Protection Co., Ltd. sent soil evaluation and investigation in accordance with Article 8 of the Soil Pollution Law. After reviewing the data, the test results are lower than the control standard; Shangke Industrial Co., Ltd. has sent the soil evaluation survey data in accordance with Articles 8 and 9 of the Soil Pollution Law. The preliminary review is currently completed, and the review will continue after the industry has completed the payment.
Completed 6 sub-soil pollution law articles 8 and 9 designated announcement business soil sampling and 1 simple well groundwater sampling operation, the sampling results of Tongcheng Industrial Co., Ltd. B04 heavy metal copper and TPH exceeded the monitoring standards, and then set up simple wells and completed Sampling, the test results are currently pending; He Quanying Enterprise Co., Ltd. F01 heavy metal copper and zinc exceed the monitoring standard, F02 heavy metal zinc exceeds the control standard, F03 TPH exceeds the monitoring standard, shall be in accordance with Article 12, Item 2 of the
|
---|---|